Engineering, construction, fabrication and maintenance for plants, facilities and buildings. Based in Pasir Gudang since 2002, and part of TECO Group from 2026.
Our work covers general industries and the oil and gas sector, from refineries and process plants to semiconductor facilities, warehouses and data centres. Our fabrication workshops in Pasir Gudang and Gebeng have a total covered area of approximately 23,900 m².
We started in 2002 with maintenance of piping systems and structures, including the supply of pipes. We extended to Singapore in 2014 and, from 2015, set up sales and marketing offices in Kuala Lumpur, Penang and Sarawak to serve existing customers and reach new ones.
In 2026 we joined TECO Group and became TECO NXG Integrated Services. Our modular prefabrication and engineering execution now work alongside TECO’s electromechanical integration and energy systems for data centres.
TECO’s global manufacturing hub for modular data centre and power equipment products.
Supporting TECO’s expansion across Southeast Asia, particularly in data centre infrastructure.
Be safety and environmentally responsible.
On time delivery of products and services.
Be the preferred partner to our suppliers and customers.
Provide excellent quality services.
Commitment to the shared success of our employees.
Continuous development and growth of the company.
Six values that guide how we work with clients, suppliers and each other, on site and in the workshop.
Fabrication runs from dedicated carbon steel and stainless steel workshops, while our sales and service offices support clients across Peninsular Malaysia, Sarawak and Singapore.
Incorporated in Johor, Malaysia.
Customised steel fabrication for a Korean factory.
Plant and equipment maintenance added to our services.
Business expanded to Pahang
EPCC project for a petrochemical plant in Selangor.
DOSH registration for unfired pressure vessels and ASME U Stamp authorisation.
Awarded CSA and steel structure work package for Pharmaceutical plant at Negeri Sembilan, Malaysia. Total amount MYR 38 millions.
Awarded steel platform & metal works package from Pelican projects.
Secured total MYR 30mil of temporary site facilities for semiconductor plant in Penang.
Awarded MEP installation works for a DC project at Elmina, Selangor
Safety personnel
Qualified first aiders and ERT
Competent site safety supervisors (SSS)
Competent safety and health officers (SHO)
In-house lead auditors
In-house scaffold personnel
Safety milestones and client awards, including 12.9 million safe man-hours without LTI on RAPID Packages 7 and 27.
ISO 9001, 14001 and 45001 management systems, ASME U and National Board R authorisation, and CIDB G7 registration.
Talk to our team about engineering, fabrication, construction and maintenance for your next project.