Modular infrastructure, EPCC and MEP for AI data centres

We build the civil, structural and power infrastructure that data centre campuses depend on, including core and shell buildings and the 275kV substations that supply them. Our scope covers design and build, authority submission, structural steel and installation packages for projects in Kuala Lumpur, Selangor and Johor.

Today this extends to AIDC skids and modules, turnkey EPCC, MEP fit-out and mission-critical maintenance, working alongside TECO’s electromechanical integration and energy systems.

1Power distribution & substationHV/LV switchgear, transformers, cabling, earthing
2HVAC & process coolingChilled water, ducting, precision cooling, controls
3Tanks, vessels & skidsShop fabrication, site erection, hydrotest
4Piping, structures & supportsStructural steel, pipe racks, welding, NDT
5Fire protection & safety systemsSprinkler, suppression, detection, commissioning
6IT & server fit-outServer racks, containment, fibre, structured cabling
7Electrical fit-outBusway, UPS, distribution boards, power cabling
8Building core & shellPiling, substructure, superstructure, architectural works

Illustrative: typical facility, not a specific project.

  1. 1Power distribution & substationHV/LV switchgear, transformers, cabling, earthing
  2. 2HVAC & process coolingChilled water, ducting, precision cooling, controls
  3. 3Tanks, vessels & skidsShop fabrication, site erection, hydrotest
  4. 4Piping, structures & supportsStructural steel, pipe racks, welding, NDT
  5. 5Fire protection & safety systemsSprinkler, suppression, detection, commissioning
  6. 6IT & server fit-outServer racks, containment, fibre, structured cabling
  7. 7Electrical fit-outBusway, UPS, distribution boards, power cabling
  8. 8Building core & shellPiling, substructure, superstructure, architectural works

Our services for data centres.

01

Modular Infrastructure & Off-Site Fabrication.

View Service
02

Integrated EPCC & Design-Build Solutions

View Service
03

Core MEP & Integrated CSA Construction

View Service
04

Mission Critical Operations & Industrial MRO

View Service

Ready for AI density

01

Cooling

Liquid cooling loops, PCW skid installation and CDU hookups, with chilled water piping and hot and cold aisle containment.

02

Power

LV switchgear, transformer positioning, overhead busway, UPS systems and BESS for high-density racks.

03

Connectivity

High-density fibre trunking, MTP/MPO backbones, MMR fit-out and overhead cable containment.

Cooling
Power
Connectivity

Data centre projects

Data Centre Steel Structure, Iskandar Puteri

KUL075 – Core and Shell

KUL073 – Core and Shell

SCF1A – Steel Structure Package

EBP1A – Brooklyn Package 2

SCF1A – Brooklyn Package

Have a project in mind?

Talk to our team about engineering, fabrication, construction and maintenance for your next project.

Contact Us